Buffer overflows in Critical Path (1) InJoin Directory Server or (2) LiveContent Directory allow remote attackers to cause a denial of service (crash) and possibly execute arbitrary code, as demonstrated by the PROTOS LDAPv3 test suite.
Search vulnerabilities
CVE-2001-1314
CVSS 2.0 · 7.5 High
EPSS 5.3%
KEV · Not listed
Vendors
Products
CVE-2001-1315
Critical Path (1) InJoin Directory Server or (2) LiveContent Directory allow remote attackers to cause a denial of service (crash) and possibly execute arbitrary code via malformed BER encodings, as demonstrated by the PROTOS LDAPv3 test suite.
CVSS 2.0 · 7.5 High
EPSS 4.3%
KEV · Not listed
Vendors
Products
CVE-2002-0786
iCon administrative web server for Critical Path inJoin Directory Server 4.0 allows authenticated inJoin administrators to read arbitrary files by specifying the target file in the LOG parameter.
CVSS 2.0 · 5.0 Medium
EPSS 3.2%
KEV · Not listed
Vendors
Products
CVE-2002-0787
Cross-site scripting vulnerabilities in iCon administrative web server for Critical Path inJoin Directory Server 4.0 allow remote attackers to execute script as the administrator via administrator URLs with modified (1) LOCID or (2) OC parameters.
CVSS 2.0 · 7.5 High
EPSS 2.9%
KEV · Not listed
Vendors
Products
Page 1 of 1.